During construction of the new E18 between Kopstad and Gulli, LNS was responsible for the Hem tunnel in Tønsberg. As a result of this project, motorists can drive along a continuous motorway between Oslo and Tønsberg.
A large part of this stretch of motorway is either dug into the ground or run through tunnels. Even though Vestfold is a relatively flat county, it was absolutely necessary to build tunnels and bridges to fulfill the requirements of a modern motorway.
|
Facts about the project |
|
|---|---|
|
Project name |
E18 Kopstad - Gulli |
|
Employer |
Public Roads Administration |
|
Type of project |
Tunnel |
|
Location |
Tønsberg, Municipality of Vestfold, Norway |
|
Contract period |
October 2004 – September 2007 |
|
Form of contract |
Sub-contract |
|
Value |
NOK 95 million |
|